What's Left To Do

So I still have a few things left to do on Wally before it's road worthy:

  1. Install new brake callipers
  2. Adjust brake pads
  3. Install integrated shifters
  4. Wrap handlebar tape
  5. Install new BB
  6. Re-install crankset
  7. Adjust front derailleur
  8. Install chain
  9. Install brake cables and housing
  10. Install shifter cables & housing
  11. Install and calibrate bike computer

The list is rather long, but it actually won't take too long to complete them. The Love in Motion reunion ride has been postponed to March 7th (too much snow on the ground today); hopefully that will give me the needed time prepare Wally to meet my friends.